Brownfield System Integration

Project Name: Brownfield

Client: Obsidian Energy

Location: Rocky Mountain House, AB

Timeline: 2015 – 2019

Crimson Facility (Brownfield Facility Retrofits and Upgrades)

Project Summary:

Crimson is a central Oil and Gas facility that successfully underwent a major upgrade to its aging control systems. The existing systems were unreliable and contributed to the recurring loss of production because of the downtime caused by the overall inefficiency and unreliability of these aging systems.

Roles and Responsibilities:

  • Combine the 3 existing independent controls systems (Allen Bradley, Delta V, Modicon 584 & relay controls) in to one integrated platform c/w distributed HMI system
  • Integration of Gas Plant and Oil Battery into centralized HMI system
  • VFD addition and integration for process controls
  • Electrical engineering and design
  • Instrument specification for the removal of pneumatic instrumentation
  • Fiber optic network design
  • On-site construction management, commissioning, start-up and operations support

Additions and Upgrades:

  • Site Water Injection expansion electrical/controls design and integration.
  • Butane Blending expansion integration.
  • Pneumatic Propane Refrigeration system retrofit and integration.

Canadian Head Office - Calgary

Suite 1610, 555 4th Ave SW
Calgary AB, Canada
T2P 3E7

US Head Office - Denver, CO

Suite 600H, 1630 Welton Street
Denver, CO
80202

US Field Office - Gillette, WY

413 South Gillette Avenue
Gillette, WY
82716

Get in Touch Using our Contact Form Below

or call Now:

• CANADA +1.403.202.7479
• USA +1.303.342.3364