More Information...
Field Gathering System A
Project Name: Gas Gathering
Client: Obsidian Energy
Location: Peace River, Alberta
Timeline: 2017-2018
Project Summary:
The scope of the project is to engineer and construct a gas gathering system in the Peace River Region in Northern Alberta. The gathering system included 4km (2.4 mile) of 4inch main gas line, 4km (2.4 mile) of 2inch FPLP 750 fuel gas line.
Roles and Responsibilities:
- Overall project management
- Multi-discipline engineering support
- Pipeline hydraulic analysis and line selection
- Pipeline analysis for slug flow
- Develop and implemented pigging and pipeline maintenance schedule
- Regulatory application and permitting
- Managed all Procurement activities for the project
- Riser and crossing detail design
- Produced “Issued for Construction” IFC drawing package
Canadian Head Office - Calgary
Suite 1610, 555 4th Ave SW
Calgary AB, Canada
T2P 3E7
Calgary AB, Canada
T2P 3E7
US Head Office - Denver, CO
Suite 600H, 1630 Welton Street
Denver, CO
80202
US Field Office - Gillette, WY
413 South Gillette Avenue
Gillette, WY
82716
Get in Touch Using our Contact Form Below
or call Now: