Project Name: Flare System Replacement
Client: Obsidian Energy
Location: Peace River, AB, Canada
Timeline: 2017-2019
Project Summary:
The scope of the project is to replace a flare system in an existing oil production facility. On this project, GRD construction manager was able to work with our team of engineers and designers to ensure all constructability issues have been addressed and implemented during the design review phase of the project.
By having our construction manager access to the 3D scanning technology, it provided the following advantages:
- Reduces overall construction time
- Pre-planning of facility shutdown
- Assist operations with the identifications of all tie-in points
- Assist client’s health and safety team in the identifications of potential safety risks
- Clarify any construction issues
- Assist in daily construction meeting
Roles and Responsibilities:
- Client Representation at Pre-Inspection Meetings
- Document Review / Traceability – Material Certificates
- Visual Inspection / Dimensional Control
- Witness Testing:
- Performance Test
- Hydrostatic Pressure Test
- Balance Test, Leak Test
- Ultrasonic Test (UT),
- Radiographic Test (RT)
- Magnetic Particle Identification (MPI), Thermographic Test, Liquid / Dye Penetrant Test (LPI/DPI), Pneumatic Test, Functional Test,
- Management of Equipment Installation
- Management of Site Construction Contractors
- Coordination of all Third-Party Vendors
- Coordination of Loose Shipped Equipment and Specialty Items
- Construction Hand Over
- Commissioning and Start-up Assistance
Canadian Head Office - Calgary
Suite 1610, 555 4th Ave SW
Calgary AB, Canada
T2P 3E7
Calgary AB, Canada
T2P 3E7
US Head Office - Denver, CO
Suite 600H, 1630 Welton Street
Denver, CO
80202
US Field Office - Gillette, WY
413 South Gillette Avenue
Gillette, WY
82716