Oil Production Pad
Project Name: Oil Production Pad
Client: Obsidian Energy
Location: Peace River, AB Canada
Timeline: 2017-2018
Project Summary:
The project scope involved providing onsite construction management the development of Oil and Gas production area in the Peace River Area.
The project included the installation following:
- Constructing 35 Oil well pad production sites
- Twenty (20) gas gathering compressor
- Three (3) main centralize compressor units
- Twenty (20) tank vent vapor recovery unit
Roles and Responsibilities:
- Client Representation at Pre-Inspection Meetings
- Document Review / Traceability – Material Certificates
- Visual Inspection / Dimensional Control
- Witness Testing:
- Performance Test
- Hydrostatic Pressure Test
- Balance Test, Leak Test
- Ultrasonic Test (UT),
- Radiographic Test (RT)
- Magnetic Particle Identification (MPI), Thermographic Test, Liquid / Dye Penetrant Test (LPI/DPI), Pneumatic Test, Functional Test,
- Management of Equipment Installation
- Management of Site Construction Contractors
- Coordination of all Third-Party Vendors
- Coordination of Loose Shipped Equipment and Specialty Items
- Construction Hand Over
- Commissioning and Start-up Assistance
Canadian Head Office - Calgary
Suite 1610, 555 4th Ave SW
Calgary AB, Canada
T2P 3E7
Calgary AB, Canada
T2P 3E7
US Head Office - Denver, CO
Suite 600H, 1630 Welton Street
Denver, CO
80202
US Field Office - Gillette, WY
413 South Gillette Avenue
Gillette, WY
82716
Get in Touch Using our Contact Form Below
or call Now: