More Information...

Pipeline Replace

Project Name: 

Client:  Alta Gas Ltd

Location: Lesser Slave Lake, AB

Timeline: 2017

Project Summary:

The project involves installing a new 4inch 3.6km pipeline to tie-in three existing gas well sites to the existing main gathering system of pipeline in the Lesser Slave Lake area.  The pipeline was being installed in the same R.O.W beside and abandoned pipeline.

Roles and Responsibilities:

  • Design all pipeline risers
  • Specified all buoyancy control for the pipeline
  • Overall project management
  • Multi-discipline engineering support
  • Pipeline hydraulic analysis and line selection
  • Pipeline analysis for slug flow
  • Develop and implemented pigging and pipeline maintenance schedule
  • Regulatory application and permitting
  • Managed all Procurement activities for the project
  • Riser and crossing detail design
  • Produced “Issued for Construction” IFC drawing package

Canadian Head Office - Calgary

Suite 1610, 555 4th Ave SW
Calgary AB, Canada
T2P 3E7

US Head Office - Denver, CO

Suite 600H, 1630 Welton Street
Denver, CO
80202

US Field Office - Gillette, WY

413 South Gillette Avenue
Gillette, WY
82716

Get in Touch Using our Contact Form Below

or call Now:

• CANADA +1.403.202.7479
• USA +1.303.342.3364