More Information...
Production Facilities B
Project Name: Permian Basin
Client: Occidental Petroleum
Location: Wyoming
Timeline: 2019
Permian Basin Production Pad (Dora Production Pad)
Project Summary:
Roles and Responsibilities:
- Client Representation at Pre-Inspection Meetings.
- Examine electrical system and equipment
- Inspection of installation of electrical equipment and wiring
- Test continuity
- Document Review / Traceability – Material Certificates.
- Visual Inspection / Dimensional Control
- Factory Acceptance Test (FAT)
- Witnessing Trial Fit-Up (Assembly)
- Tagging Inspection
- Packing and Marking Inspection
- Pre-Shipping Inspection
- Final Inspection Sign Off
Project Name: Permian Basin
Client: Occidental Petroleum
Location: Wyoming
Timeline: 2020
Permian Basin Production Pad (Fusion Production Pad)
Project Summary:
GRD has been providing third-party inspection services to the energy and resource-based industries for over 15 years. We take great pride in the experience of our team and their ability to provide safe, cost-effective solutions to meet our client’s inspection needs. Through the efforts and expertise of our people, GRD has become a recognized choice when comes to assisting clients to deliver their product from the wellhead to point of sales.
Roles and Responsibilities:
- Client Representation at Pre-Inspection Meetings.
- Examine the electrical system and equipment
- Inspection of installation of electrical equipment and wiring
- Test continuity
- Document Review / Traceability – Material Certificates.
- Visual Inspection / Dimensional Control
- Factory Acceptance Test (FAT)
- Witnessing Trial Fit-Up (Assembly)
- Tagging Inspection
- Packing and Marking Inspection
- Pre-Shipping Inspection
- Final Inspection Sign Off
Canadian Head Office - Calgary
Calgary AB, Canada
T2P 3E7
US Head Office - Denver, CO
Suite 600H, 1630 Welton Street
Denver, CO
80202
US Field Office - Gillette, WY
413 South Gillette Avenue
Gillette, WY
82716
Get in Touch Using our Contact Form Below
or call Now: